In our view, EV chargers, solar panels and batteries are now everyday work for a good many electrical contractors. Since the start of this month, the specification that certification bodies assess contractors against treats each of those as a work category of its own, with qualifications expected of the people doing it.

That sounds like paperwork. In our view it also changes the questions a buyer will put to any contractor that earns money from low-carbon work. Where we say what a buyer is likely to ask, that is our view from working on business sales, not a survey of buyers.

What changed on Thu 1st Oct

The document is the Electrotechnical Assessment Specification, usually shortened to EAS. NICEIC’s guidance on the changes says the revised requirements apply from Thu 1st Oct and add four low carbon work categories: EV charging equipment, solar PV systems, electrical energy storage systems and micro wind turbines.

For EV charging, solar PV and energy storage the wording is the same. All employed persons undertaking the work, and the Qualified Supervisors responsible for it, need to hold the relevant acceptable qualifications.

Two details in that guidance matter more than they first appear to. The first is who counts. NICEIC says “employed persons” means anyone engaged by the business to do electrotechnical work, which may include direct staff, temporary or agency workers and subcontracted labour, including self-employed individuals and sole traders. On that wording, the subcontractor who fits your chargers may well be inside the requirement, not outside it.

The second is that this is not one scheme’s rule. The same page says the changes are not specific to NICEIC, because the EAS is intended for use by all electrotechnical certification bodies.

How it is checked

NICEIC says that at a contractor’s next assessment the assessor will ask the business to confirm the work categories it intends to undertake and how it meets the new requirements. If the business cannot demonstrate that, the guidance says NICEIC will work with it to agree an action plan.

We read that as a managed start, not a cliff edge. But it does mean a gap gets written down. A contractor that says it does solar and has nobody holding the solar qualification will, on that wording, have a plan with its certification body to close the gap.

Why the timing matters

The work itself is growing. MCS, the certification scheme for small-scale renewables, said on Thu 20th Aug that the UK saw 210,000 certified installations in the first half of 2026, including almost 150,000 solar installations and 36,000 batteries. A quarter of this year’s installations were on new build properties, and MCS estimates that 59% of new homes in the opening quarter of 2026 were fitted with certified solar panels.

In England, on-site renewable generation on new homes is set to become a requirement. The government’s building circular of Tue 24th Mar 2026 sets out a new functional requirement for on-site renewable electricity generation when a new dwelling is built. The regulations come into force on Wed 24th Mar 2027. An individual building is exempt if its notice or application went in before that date and work on it starts before Fri 24th Mar 2028.

Put the two together. In our view an electrical contractor working for housebuilders in England should expect solar to become a standard part of the package, at the same moment a certified business has to show that the people fitting it hold an acceptable qualification.

What we would expect a buyer to ask

In our view a buyer will treat low-carbon work as a scope that has to be proved, in roughly this order:

  1. The categories. Which of the four does the business say it does, and what did it confirm at its last assessment?
  2. The people. Who holds each qualification, name by name, and does the Qualified Supervisor hold the ones for the work they sign off?
  3. The subcontractors. Is there a copy of each subcontractor’s qualification on file, given that they can count as employed persons?
  4. The action plan. Is one open with the certification body, what does it cover and when does it close?
  5. The income. How much turnover comes from each category, so the buyer can see how much money rests on how few people?

The last question is the one we would think about hardest. If one engineer holds the only battery qualification in the business, the battery income depends on that engineer staying. If the owner is that person, the buyer is looking at the same succession problem as with any other sign-off role, and we would expect it to show up in the terms of the deal.

None of this takes long to put right on paper. A single page with names down the side, categories across the top and a certificate behind each tick answers most of it. We have written before about EV charging as a revenue stream and about this year’s chargepoint grant changes. The page of names is what lets a buyer rely on that income.

The live electrical listing

We checked the electrical opportunities page on Wed 7th Oct 2026. It has one live listing with its own page: an established electrical contracting and utility services group in the East of England, for sale because the shareholders are retiring.

EV charging installations are on its list of services, alongside electrical design and installation, testing, inspection and maintenance, low-voltage cable jointing, 24/7 reactive fault response and dig and reinstatement works. The listing page gives FY2025 turnover of approximately £4.01m and adjusted EBITDA of approximately £938,000. It says the business holds the relevant industry accreditations. It does not say who holds which qualification, so that is a fair question for a serious buyer to raise early.

If you are looking to buy, you can register your acquisition criteria. If you own a contractor and want a sense of where it sits, the electrical valuation calculator gives an indicative range and commits you to nothing.

In our view, demand for this work is not the question. What a buyer needs to see is who in the business is qualified to do it.