Fixed Prices, Rising Costs: What a Buyer Reads in an Electrical Contractor’s Contract Terms

Date Posted:

29 October, 2026

Share This:

In our experience, an electrical contractor can tell you what a job cost to build to the pound. Ask what the price was based on, and when, and the answer can be a quotation dated months before the cable was bought. That gap between the price agreed and the cost incurred is where margin is made or lost, and it is one of the things we would expect a buyer to look at closely.

It is worth looking at now because costs are moving. Below we set out what the government’s latest figures show, what the electrical trade body says about price clauses, and how we would expect a buyer to read the terms in a contract book. Where we describe how buyers behave, that is our view from working on business sales. The figures and the guidance are linked to their sources.

What the latest figures show

The government’s construction building materials commentary, published on Wed 7th Oct, shows the price of construction materials for all work up 6.4 per cent in the 12 months to August 2026. Repair and maintenance materials were up 5.9 per cent, and the month on month rise was 0.4 per cent.

BCIS, which reported the same provisional data on Thu 8th Oct, described 6.4 per cent as the highest annual rate since the 8.5 per cent seen in March 2023. Its senior economist put the continuing pressure down to steel and to products that are energy intensive or derived from oil, and said any relief from lower fuel costs would be temporary while disruption to energy supply persists.

Some categories are well above the average. BCIS reports that fabricated structural steel was up 21.2 per cent over the year and rigid pipes and fittings up 15.5 per cent, and that central heating boilers rose 5.2 per cent in the month alone (BCIS). None of those is an electrical item, but they show how uneven the movement is.

A caution on what this does not tell us. It is an index for construction materials as a whole. The government’s commentary gives no price changes for cable, copper or switchgear, so we cannot say from it what has happened to the cost of an electrical installation. An owner will know their own supplier prices better than any index. What the index does show is that the cost of materials is higher than a year ago.

The same commentary reports that construction output fell by 0.5 per cent in the three months to July. It also reports, from the Bank of England’s agents, that contacts still cite heightened uncertainty and continuing cost pressures as factors delaying construction projects. In our view that combination matters to a contractor: costs that rise while clients hesitate leave little room to pass them on.

What a price clause does

The Electrical Contractors’ Association publishes a guidance note on this, hosted by the Construction Leadership Council, titled Indexation of Pricing: Fluctuations. The plain idea in it is simple. A fluctuation or indexation clause lets the contract price move with the cost of labour, materials or other items over the life of the work. Without one, the note says, a contractor is held to the price it tendered “regardless of whether those prices subsequently rise or fall”.

Under the JCT standard building contract and design and build contract, the note describes three options. Option A adjusts the price for changes in tax on materials and in contributions, levies and taxes payable on workers. Option B adjusts it for changes in the market price of materials and goods or the cost of labour. Option C adjusts it by formula, using the JCT Formula Rules and BCIS price adjustment indices.

The note adds a point worth knowing. In the 2016 JCT contracts, Option A is the only option set out in the schedules, and if no option is chosen it applies by default. It tells members to check whether the client or main contractor has deleted the fluctuation provisions in the contract particulars or changed them by amendment.

For NEC contracts, the note says most pricing options allow the price to be adjusted for inflation under Option X1. The parties list the items that can be adjusted and the indices to be used in the contract data, and a price adjustment factor is then applied.

Where clauses are used, and where they are struck out

The ECA note is direct about this. It says indexation provisions are “nearly always removed” from construction contracts, because the client or main contractor wants certainty of price, although they are “routinely used” in FM and maintenance, framework, call-off and strategic alliancing contracts.

That split is useful for an owner trying to explain a contract book. A framework call-off or a maintenance contract is more likely to carry some price mechanism. A one-off project won under a main contractor’s amended sub-contract may well not. The ECA note also says heavily amended sub-contracts are “unlikely to cater for indexation provisions”, and suggests members consider adding wording derived from the JCT options before signing, where they are pricing in a volatile period.

We have written about public sector frameworks in electrical contracting, where call-off terms matter a great deal to how work is priced.

A clause is not a cure

It would be wrong to read this as “get a clause and the risk goes away”. The ECA note does not say that. Writing with the 2022 price spike in mind, it warns that the index chosen has to reflect real costs, and that “a lot of indices are failing to keep up with the speed of rising inflation”. It records that during 2022 the electrotechnical sector saw inflation rise above 23 per cent while general inflation as measured by CPI had risen more slowly, to above 10 per cent. It also says that members with indexation clauses in framework and maintenance contracts are likely to have gained limited benefit in 2022, given how fast prices rose.

So a clause is a tool, and whether it works depends on the index, the base date, the items covered and the client’s willingness to apply it. In our view a buyer who knows this will not give credit for a clause on its face. We would expect them to ask whether it has ever been used, and what came back.

Labour moves too

Materials are only part of what a fixed price has to cover. For contractors who employ graded operatives under the national agreement, the pay deal reached through JIB talks involving the ECA, SELECT and Unite runs to 2028. It provides 3.95 per cent for graded operatives from Mon 5th Jan 2026, 4.6 per cent from Mon 4th Jan 2027, and 4.85 per cent from Mon 3rd Jan 2028, with apprentices on 2 per cent in 2027 and 3 per cent in 2028.

Those dates are known, which makes them easier to plan for than the price of copper. But a fixed-price contract signed now, with work running into 2027, will be delivered partly at the higher rate. In our view a buyer looking at a long fixed-price contract will ask whether the labour rise was in the tender, and we would expect a good answer to be a number, not a feeling.

Not every kind of work carries the same exposure

In our view, the right question for a buyer is not whether the business has price risk, but where in the book it sits. Different kinds of electrical work carry it differently, and an owner who separates them gives a buyer something to test.

Testing, inspection and maintenance work is, in our view, mostly labour. The price risk is in the pay rate and the time per visit, and a contract that runs for years may have its own review mechanism. We would expect a buyer to value that income for its regularity, and we have written about why recurring testing income carries weight.

In our view, installation projects are the opposite: more materials, a longer gap between tender and purchase, and more exposure if the contract is fixed. EV charging and solar work depend on equipment priced from supplier lists, so the key date is when the order is placed against the date the customer signed. Reactive work and small jobs are priced close to the day, and in our view the risk there is lower, though so is the certainty of the next job.

We would expect a buyer to want revenue split along those lines for the last three years, with margin against each. It is the simplest way to show where the price terms matter and where they do not.

How we would expect a buyer to read the book

What follows is our view. It comes from the questions we see asked in a sale. There is no published study behind it.

We would expect a buyer to sort live contracts into three groups. The first is contracts that carry a price mechanism and where it has worked in practice. The second is fixed-price contracts with a lot of work still to do, where today’s costs may differ from those in the tender. The third is contracts where most of the work is already done and the price risk has passed.

The second group is the one we would expect to draw most questions. A fixed-price job that is only a fifth complete carries more of the risk than one that is nearly finished, and the buyer is inheriting it. In our view a contractor that can show the remaining cost against the remaining value, job by job, is a good deal easier to price than one that can only say the work is going well.

We would also expect questions about quotations that are out and not yet accepted. A quote is a promise to supply at a price for a period. How long are your quotes open, and when were the supplier prices behind them taken? A buyer who sees a pile of long-dated quotations at last quarter’s prices may assume some of them will be accepted at a loss.

Then there is the chain below you. If your client’s contract has no price clause, and your supplier’s terms let them change the price, you are carrying the difference. We would expect a buyer to ask whether your own terms with suppliers and sub-contractors mirror the position with your client.

Finally, we would expect a buyer to look at gross margin over time rather than the latest year. A margin that has held while materials rose says something different from one that was flattered by a few good jobs.

The record an owner can build now

None of this needs a sale to be useful, and it helps you price the next job.

Start with a schedule of live contracts. For each one, note the client, the value, the percentage complete, the remaining cost and whether there is any price adjustment clause. If there is, note the base date and which option or index it uses.

Add the open quotations, with the date each was priced and how long it is valid. Where a supplier price was taken, note which and when.

Then keep a record of what you recovered. If you have claimed an increase under a clause, or agreed one by variation, note the amount and how long it took. If you absorbed a rise, note that too. We would expect a buyer to find either answer informative, and it is better that the figures come from you.

Last, compare the margin at tender with the margin now, by job. This is plain job-cost reporting, and most contractors already hold the data. It is the clearest way to show whether the price terms in the book are working. None of this is legal advice, and a solicitor or the ECA’s own team is the right person for the wording of a particular clause.

Contracted work, as a live listing shows it

We have one live listing on the electrical site. The electrical contracting and utility services group in the East of England is a retirement sale, established in 1981. Its listing gives turnover of approximately £4.01m and adjusted EBITDA of approximately £938,000 for the year ended 2025, with turnover up from approximately £2.13m in 2022.

What stands out, in our view, is how the listing describes the work. It says the group holds multi-year contracted work, including long-term contracted work with a national energy provider, and that the delivery capability is in-house. The listing does not say how those contracts treat changes in cost. That is the sort of question we would expect a buyer to put once an NDA is in place, and it is one an owner in the same position could answer in advance. We last checked the listing on Thu 15th Oct 2026.

Where this leaves an owner

Costs are rising, and an electrical contractor cannot control the price of materials. What an owner can control is how clearly the contract book shows where the risk sits. In our view a business that can show its price terms, its open quotations and its record of recovery is easier to trust than one that cannot, because the buyer is not left to guess.

If you own an electrical business and want an indicative range, the electrical valuation calculator takes a few minutes and commits you to nothing. We have also written about why recurring testing income carries weight with buyers. If you are a buyer, you can register your acquisition criteria and hear about suitable businesses as they come to market.